Wednesday, 13 January 2010
No Salt Today 13/01/2010
Sunday, 29 March 2009
Freshwater Weekend 29/03/2009
Sunday, 15 February 2009
Messing about on the River 15/02/2009
Sunday, 25 January 2009
Where's the Wind Then?! 25/01/09
Sunday, 23 November 2008
What No Salt!!! 23/11/2008
Sunday, 16 March 2008
Change of plan - 16/03/08
As well as fighting against the current I also had to dodge the odd obstacle coming towards me i.e trees, tyres etc....
My return journey should be a lot easier with the flow. Managed to get back to my launch point in ten minutes reaching a maximum speed of 10.5 mph.
Due to the volume of water in the River the sluice gates were actually serving their purpose in preventing too much water entering the feeder.
These sluice gates feed the Melingriffith Feeder which then makes its way to the old Glamorganshire Canal, where they run in parallel down to the old Tin Works and out the other side at Melingriffith Lock. Built in 1749, the Melingriffith Tinplate Works sat on or near the site of an old corn mill that had existed as far back as the twelfth century. It was once the largest tin works in the UK, until the construction of the Treforrest Tin Works. The works closed in 1957, and today the only obvious traces that the works ever existed at all are the Melingriffith Feeder that runs down from the River Taff. The works themselves appear to have been completely cleared, and the site today is a modern housing estate.
After doing the obligatory risk assessment, which is a compulsory must these days, it was deemed stupid to attempt the weir today without the necessary rescue team on hand!
Sunday, 2 March 2008
On the Taff - 02/03/08
Just as I got to the motorway bridge I made my customary detour to the opposite side of the river so as not to disturb the 'ever so friendly' fishermen, should leave them a bag for their rubbish!!
As I pass under the bridge I get my first glimpse of Castell Coch, meaning Red Castle, nestled in the trees.
This fairytale creation of the Victorian age was designed by William Burges for the 3rd Marquis of Bute. The Castle was rebuilt from the ruins of a medieval castle and, with a few exceptions, is a fairly authentic reconstruction, at least externally.
The original castle was probably built at the end of the 11th century or early in the 12th century, and it was possibly at this time that the stone castle comprising a small oval courtyard with three circular towers was built by the Normans at Castell Coch.
Next up 'playtime'.
This section of the River is the first bit of rough water, not much but enough to have a bit of fun with. You can often catch a small wave here, nothing like the scale of The Bitches but a good practice all the same. Paddled on for a short while, up as far as the footbridge by Taff's Well railway station, which is now receiving a well needed face lift, then turned back down river.
After a short play about in the rougher water again I carried on down river to The Weir. Radyr Weir was first constructed during 1774-1775 to provide water along a feeder to power the Mellingriffith tin-plate works. This weir is the third obstruction to migratory fish and kayakers on the river Taff, the others being Llandaff Weir and Blackweir, all of these have fish passes.
Weir could have done with a bit more water in it for a better ride down, but still got a fair soaking!
Since the early 1980s the salmon and sea trout stocks in the Taff have been recovering from nearly 200 years of industrial pollution and exploitation. During 1993 the National Rivers Authority monitored over 500 salmon and 700 sea trout returning to the river to spawn. Therefore warranting a need for these fish passes at the weirs, although not quite sure how they get up them!